A. ip route 209.165.201.0 255.255.255.224 209.165.202.130
B. ip route 0.0.0.0 0.0.0.0 209.165.200.224
C. ip route 209.165.200.224 255.255.255.224 209.165.202.129 254
D. ip route 0.0.0.0 0.0.0.0 209.165.202.131
Correct Answer: C
cisco ccna cyber ops certification.WAN connections consist of numerous types of devices and components. Figure 24.1 gives some of the WAN terms used for these devices and components, while Table 24.1 gives the definitions of these terms. As stated in Chapters 2 and 10, data communications equipment (DCE) is used to terminate the connection between two sites, provide clocking and synchronization for the connection, and connect to data terminal equipment (DTE). o DCEs include channel service units/data service units (CSU/DSU).Class 1 network terminators (NT1) and devices such as cable and analog modems. DTEs are end-user devices, such as routers or PCs, that connect to the WAN through a DCE. in some cases, the physical interface of the DTE may have the functionality of a DCE built into it; for example, some Cisco routers have an NT1 or CSU/DSU built into the WAN interface, and some laptops have a built-in analog modem.Local LoopDemarcation Point Diagram 24.1 WAN TerminologyChapter 24 Introduction to the WAN 641Exam Essentials DCE devices include modems and CSUs/DSUs o The CSU/DSU terminates the digital/synchronous (leased line) circuit, while the modem terminates the analog/asynchronous (telephone) circuit o The CSU/DSU is responsible for providing the clock and synchronizing signals between the DTE (such as a router) and the DCE (the CSU/DSU itself). This is intended to support channelized services such as dedicated T1 as well as services such as Frame Relay. Routers are often considered as DTE devices.Table 24.1 WAN terms and their definitions ° Definition of termsCustomer front-end equipment (CPE) Equipment in the subscriber network, including DCEs (modems, NT1s, CSUs/DSUs) and DTEs (routers, access servers)Demarcation Point The point of demarcation between the carrier's responsibilities and the subscriber's responsibilities, which may be inside or outside of the local facility. Note that this is the logical boundary and not necessarily the physical boundaryLocal Loop Connection from the carrier switching equipment to the demarcation pointCentral Office (CO) switch Carrier's switch in the long distance telephone network
A. ip route 209.165.201.0 255.255.255.224 209.165.202.130
B. ip route 0.0.0.0 0.0.0.0 209.165.200.224
C. ip route 209.165.200.224 255.255.255.224 209.165.202.129 254
D. ip route 0.0.0.0 0.0.0.0 209.165.202.131
Correct Answer: C
A. to analyze traffic and drop unauthorized traffic from the Internet
B. to transmit wireless traffic between hosts
C. to pass traffic between different networks
D. forward traffic within the same broadcast domain
Correct Answer: C
A. switchport mode trunk
B. switchport mode dynamic desirable
C. switchport mode dynamic auto
D. switchport nonegotiate
Correct Answer: B
A. transfers a backup configuration file from a server to a switch using a username and password
B. transfers files between file systems on a router
C. transfers a configuration files from a server to a router on a congested link
D. transfers IOS images from a server to a router for firmware upgrades
Correct Answer: D
A. different nonoverlapping channels
B. different overlapping channels
C. one overlapping channel
D. one nonoverlapping channel
Correct Answer: D
Exam Code: 200-301
Exam Duration: 120 minutes
Exam Topics:
Latest Update: 11.21,2024
For office workers or college students, TOPONEDUMPS CCNA 200-301 dumps are all selected by professional instructors which cover significant and fundamental exam questions to save you precious time to study. All you need to do is to make a plan according to CCNA 200-301 dumps we provide at your convenient time.
Besides, with 100% real of CCNA 200-301 practical testing, you can access a remote server for simulated exams to well master the knowledge of the CCNA 200-301 test.
What's more, with private tutoring and customer service, TOPONEDUMPS employees will help you with all kinds of difficulties, challenge questions during CCNA 200-301 dumps you study as well as tips on how to pass the CCNA effortlessly.
To possess the CCNA Certificate and higher salary with TOPONEDUMPS assistance.
With 100% correct and valid exam questions and corresponding answers, TOPONDUMPS will help you know all the exam structure and how to answer correctly. Pass the CCNA 200-301 Exam in a short time of preparation for exams with our assistance.
Always providing you with the latest updating dumps of the CCNA 200-301 Exam. No need to spend much time googling questions and answers on the internet.
The professional customer consultancy service team is 24/7 online and offering you the latest news and tips on how to study and prepare for the CCNA 200-301 Exam.
Payment
Deliver Dumps
30day Free Update
Training,Pass Exam
We provide stable and high-quality real exam dumps, you only need to remember the contents of the dumps will be able to easily pass CCNA 200-301 Exam
We will follow the latest exam trends. Once the exam content changes, we will immediately update dumps to ensure stability and send them to your email.
We will update the free charge of the latest material for you as soon as possible after the change. Your service time will start from our stable date again.
When you complete the bill. We will send you the dumps information via email.
We accept multiple payment methods. Most customers use online payment with PayPal or Western Union. PayPal and Western Union are both very secure payment methods.