A. ip route 209.165.201.0 255.255.255.224 209.165.202.130
B. ip route 0.0.0.0 0.0.0.0 209.165.200.224
C. ip route 209.165.200.224 255.255.255.224 209.165.202.129 254
D. ip route 0.0.0.0 0.0.0.0 209.165.202.131
Correct Answer: C
ccna like.Figure 18-2 PPP Layered ArchitectureThe process of a complete PPP session consists of four phases: the link establishment phase, the link quality determination phase, the network layer control protocol negotiation phase, and the link termination phase.Link Establishment Phase: Both sides of the PPP communication exchange configuration information using the link control protocol, and once the configuration information is successfully exchanged, the link is declared established. The configuration information usually uses default values, and only configuration options that do not depend on the network control protocol are configured by the link control protocol at this point. It is important to note that any non-link control protocol packets are dropped without any notice during link establishment.Link quality determination phase: the link control protocol is responsible for testing the quality of the link to see if it can carry the network layer protocols. In this phase, the link quality test is an option provided by the PPP protocol and may or may not be performed. Also, if the user selects the PPP verification protocol, the verification process will be completed in this phase. PPP supports two authentication protocols: Password Authentication Protocol (PAP) and Challenge Handshake Authentication Protocol (CHAP). Network Layer Control Protocol Negotiation Phase: After both sides of the PPP session have completed the above two phases, they begin to configure the network layer protocols, such as IP and IPv6, using the appropriate network layer control protocols.Link termination phase: The link control protocol terminates the link by exchanging link termination packets. There are many reasons for link termination such as carrier loss, authentication failure, expiration of the idle cycle timer or administrator shutdown of the link.Chapter 18 HDLC and PPP .341 .18.1.3 PPP Frame StructureThe PPP frame structure is shown in Figure 18-3 and contains six fields, the meaning of each field is described below.Figure 18.3 PPP Frame Structure1 Flag (8 bits): indicates the beginning or end of the frame and consists of the binary sequence 01111110.
A. ip route 209.165.201.0 255.255.255.224 209.165.202.130
B. ip route 0.0.0.0 0.0.0.0 209.165.200.224
C. ip route 209.165.200.224 255.255.255.224 209.165.202.129 254
D. ip route 0.0.0.0 0.0.0.0 209.165.202.131
Correct Answer: C
A. to analyze traffic and drop unauthorized traffic from the Internet
B. to transmit wireless traffic between hosts
C. to pass traffic between different networks
D. forward traffic within the same broadcast domain
Correct Answer: C
A. switchport mode trunk
B. switchport mode dynamic desirable
C. switchport mode dynamic auto
D. switchport nonegotiate
Correct Answer: B
A. transfers a backup configuration file from a server to a switch using a username and password
B. transfers files between file systems on a router
C. transfers a configuration files from a server to a router on a congested link
D. transfers IOS images from a server to a router for firmware upgrades
Correct Answer: D
A. different nonoverlapping channels
B. different overlapping channels
C. one overlapping channel
D. one nonoverlapping channel
Correct Answer: D
Exam Code: 200-301
Exam Duration: 120 minutes
Exam Topics:
Latest Update: 11.21,2024
For office workers or college students, TOPONEDUMPS CCNA 200-301 dumps are all selected by professional instructors which cover significant and fundamental exam questions to save you precious time to study. All you need to do is to make a plan according to CCNA 200-301 dumps we provide at your convenient time.
Besides, with 100% real of CCNA 200-301 practical testing, you can access a remote server for simulated exams to well master the knowledge of the CCNA 200-301 test.
What's more, with private tutoring and customer service, TOPONEDUMPS employees will help you with all kinds of difficulties, challenge questions during CCNA 200-301 dumps you study as well as tips on how to pass the CCNA effortlessly.
To possess the CCNA Certificate and higher salary with TOPONEDUMPS assistance.
With 100% correct and valid exam questions and corresponding answers, TOPONDUMPS will help you know all the exam structure and how to answer correctly. Pass the CCNA 200-301 Exam in a short time of preparation for exams with our assistance.
Always providing you with the latest updating dumps of the CCNA 200-301 Exam. No need to spend much time googling questions and answers on the internet.
The professional customer consultancy service team is 24/7 online and offering you the latest news and tips on how to study and prepare for the CCNA 200-301 Exam.
Payment
Deliver Dumps
30day Free Update
Training,Pass Exam
We provide stable and high-quality real exam dumps, you only need to remember the contents of the dumps will be able to easily pass CCNA 200-301 Exam
We will follow the latest exam trends. Once the exam content changes, we will immediately update dumps to ensure stability and send them to your email.
We will update the free charge of the latest material for you as soon as possible after the change. Your service time will start from our stable date again.
When you complete the bill. We will send you the dumps information via email.
We accept multiple payment methods. Most customers use online payment with PayPal or Western Union. PayPal and Western Union are both very secure payment methods.