A. ip route 209.165.201.0 255.255.255.224 209.165.202.130
B. ip route 0.0.0.0 0.0.0.0 209.165.200.224
C. ip route 209.165.200.224 255.255.255.224 209.165.202.129 254
D. ip route 0.0.0.0 0.0.0.0 209.165.202.131
Correct Answer: C
200-301 syllabus.Depending on the design of the network, the failure of a single component can mean an operational outage that affects at least some users. Network engineers refer to these components as "single points of failure" when a failure causes that part of the network to shut down. For example, in Figure 6-1, the LAN has some redundant devices, but the WAN does not. If most traffic flows between these two sites, then there are many single points of failure, as shown in the figure.Figure 6-1 R1 and WAN Links as Single Points of Failure Several components are marked as single points of failure in this diagram. If any of the marked parts of the network fail, then packets cannot flow from the left network to the right. Typically, to improve availability, a network engineer first examines the design ideas to find the single point of failure. Then, choose where to add it from, so that one (or more) single point of failure has a redundancy option, which in turn enhances availability. Typically, the engineer will: . Add redundant devices and links... Implement any required features that utilize the redundant devices or redundant links. For example, for all of the single points of failure in Figure 6-1, the largest cost would be for the WAN link given the ongoing monthly expenses. However, statistically speaking, the WAN link is the component that is most likely to fail. Therefore, a reasonable escalation for the network in Figure 6-1 would beDo I already know this? Answer to the subtest.1.2 Foundation Components 129(1) d (2) c (3) a (4) c (5) b (6) c Add a WAN link and, if possible, even have the link connect to another router in the right-hand network, as shown in Figure 6-2.Figure 6-2 Higher availability, but R1 is still a single point of failureIn practice many corporate networks are designed according to Figure 6-2, with one router per remote network, two WAN links back to the primary site, and redundant routers at the primary site (right in the figure). The design scenario in Figure 6-2 has fewer single points of failure compared to Figure 6-1. Of the remaining single points of failure, one risk remains, but it is a calculated risk. For many operational outages, a router reload solves the problem and the outage is short. However, the risk still exists that when the switch or router hardware fails completely, getting a new replacement unit to the site takes time to get the site working properly again.The next step in improving remote site availability for businesses that can accept greater expense is to avoid router and switch failures that can lead to catastrophic consequences. Adding a router to the network on the left side of Figure 6-2 would resolve all of the single points of failure previously marked. Figure 6-3 gives a design scenario using a second router that is connected to a different LAN switch so that SW1 is no longer a single point of failure.VLAN 10 subnet 10.1.1.0/24Figure 6-3 Resolving all single points of failure in a network design
A. ip route 209.165.201.0 255.255.255.224 209.165.202.130
B. ip route 0.0.0.0 0.0.0.0 209.165.200.224
C. ip route 209.165.200.224 255.255.255.224 209.165.202.129 254
D. ip route 0.0.0.0 0.0.0.0 209.165.202.131
Correct Answer: C
A. to analyze traffic and drop unauthorized traffic from the Internet
B. to transmit wireless traffic between hosts
C. to pass traffic between different networks
D. forward traffic within the same broadcast domain
Correct Answer: C
A. switchport mode trunk
B. switchport mode dynamic desirable
C. switchport mode dynamic auto
D. switchport nonegotiate
Correct Answer: B
A. transfers a backup configuration file from a server to a switch using a username and password
B. transfers files between file systems on a router
C. transfers a configuration files from a server to a router on a congested link
D. transfers IOS images from a server to a router for firmware upgrades
Correct Answer: D
A. different nonoverlapping channels
B. different overlapping channels
C. one overlapping channel
D. one nonoverlapping channel
Correct Answer: D
Exam Code: 200-301
Exam Duration: 120 minutes
Exam Topics:
Latest Update: 12.02,2024
For office workers or college students, TOPONEDUMPS CCNA 200-301 dumps are all selected by professional instructors which cover significant and fundamental exam questions to save you precious time to study. All you need to do is to make a plan according to CCNA 200-301 dumps we provide at your convenient time.
Besides, with 100% real of CCNA 200-301 practical testing, you can access a remote server for simulated exams to well master the knowledge of the CCNA 200-301 test.
What's more, with private tutoring and customer service, TOPONEDUMPS employees will help you with all kinds of difficulties, challenge questions during CCNA 200-301 dumps you study as well as tips on how to pass the CCNA effortlessly.
To possess the CCNA Certificate and higher salary with TOPONEDUMPS assistance.
With 100% correct and valid exam questions and corresponding answers, TOPONDUMPS will help you know all the exam structure and how to answer correctly. Pass the CCNA 200-301 Exam in a short time of preparation for exams with our assistance.
Always providing you with the latest updating dumps of the CCNA 200-301 Exam. No need to spend much time googling questions and answers on the internet.
The professional customer consultancy service team is 24/7 online and offering you the latest news and tips on how to study and prepare for the CCNA 200-301 Exam.
Payment
Deliver Dumps
30day Free Update
Training,Pass Exam
We provide stable and high-quality real exam dumps, you only need to remember the contents of the dumps will be able to easily pass CCNA 200-301 Exam
We will follow the latest exam trends. Once the exam content changes, we will immediately update dumps to ensure stability and send them to your email.
We will update the free charge of the latest material for you as soon as possible after the change. Your service time will start from our stable date again.
When you complete the bill. We will send you the dumps information via email.
We accept multiple payment methods. Most customers use online payment with PayPal or Western Union. PayPal and Western Union are both very secure payment methods.